It’s been a month since I updated on the house. I’m there every few days and take plenty of photos. Last time I updated, we’d just received our stucco and cabinets…

IMG_0221IMG_0224IMG_0222

Right before Valentine’s Day, the house had its stonework laid, including the fireplace inside. Our backpack rack was installed by the garage door and all of the trim was painted.

IMG_0223IMG_0225

Our utility sink had been forgotten, so a hole was cut for that cabinetry, and Lillian remained goofy.

IMG_0255IMG_0256IMG_0258IMG_0279IMG_0280IMG_0281

Walls were painted.

IMG_0304IMG_0306IMG_0311

Light fixtures installed!

IMG_0312IMG_0314IMG_0309

Bathroom tile started!

IMG_0315IMG_0316

Our air conditioner arrived. It’s large. Hooray!

IMG_0317IMG_0319IMG_0320

Our lot had a preliminary cleaning in preparation for our driveway.

IMG_0363IMG_0364

IMG_0366IMG_0367IMG_0368

Tile was installed!

IMG_0417IMG_0421IMG_0369IMG_0406IMG_0411IMG_0416

The sunsets out our backyard continued to paint the sky.

IMG_3171IMG_3186IMG_3187

We got a driveway! Our fancy dining room ceiling was installed! We got reverse locked out (the temp door knob on the patio door is reversed so we were locked out of the back patio) so Chelsey crawled through the window to unlock the patio door.

IMG_3203IMG_3205

Garage doors!

IMG_3189IMG_3216IMG_3217IMG_3219

Graded dirt for our yard! Much nicer.

IMG_0445IMG_0452IMG_3234

We arrived to visit and the electrician was there – he showed us…working lights! FUN!

IMG_3235IMG_3244IMG_3240

IMG_3242IMG_3250

Our finished ceiling. The girls were so excited to be able to finally see their bathroom without a flashlight app on our phones.

The same morning we saw our new, working lights, the posts were put in for our fence. When we came back later the same day, fence!

IMG_3232IMG_3238IMG_3239IMG_3256

That’s the last month of construction of our house. Lots of other things happened that aren’t quite as photo worthy, but still important. The AC was connected, other wiring done, the outside spigots work, the little stickers that alert you that your outlet is a GFCI were placed on the outlet plates. The house even got it’s first rough cleaning. The tub that had been filled with building debris, paint splatters and dried grout and caulk is sparkling. The windows no longer have paint and caulk on them. Things are really shaping up. This week’s progress should include, steps off the back patio, installation of our real front door, counter tops, and more painting. Once counter tops are installed, then the kitchen backsplash.